38 m is designed for 2 way slab and post anxiety slab as per provisions of respective IS codes. The load from the building above reasons tension in the backside of the grade beam. This is our idea of the simplest slab but there are some other options that you could trust that can better fit your needs. My question is should the mat bars turn down into the beam around the edge or simply be tied autocad task help the cage of 5’s that runs within the trench?Mar 01, 2008 · Drill rebar pins into the footing per ICF specs and tie the vertical rebar into the slab rebar and the horizontal rebar that runs around the top of the ICFs. The traditional strategies for forming autocad initiatives monolithic slab basis are especially time and labor in depth autocad assignment help set up and take down after the cement is poured. Jul 31, 2016 · Reinforcing steel – Steel in the basis and slab was 5/8 inch and grade 40 rebar.